The RFP Database
New business relationships start here

Bridge Rehabilitation

  1. This RFP had a pre-bid event.


Missouri, United States
Government : County
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Bridge Rehabilitation consists of replacement of existing rail deck floor system (floor beams and stringers). Replacement of existing track, ties and rails on main river spans. Removal of existing paint and installation of new paint system on main river spans. Perform steel, concrete and masonry repairs on main river spans and west approach. Perform miscellaneous upgrades to emergency systems and install an inspection access cable.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP