Scope includes the erosion repairs consisting of: construction of 940 cubic yards of concrete structure (reinforced concrete encasement - webwall) of the existing bridge main channel bents and piers with temporary special shoring for de-watering the river bottom at each bank to complete the work, excavation and backfill for structures, temporary erosion, sedimentation, and environmental controls, and required traffic control.