This Contract provides for the improvement by removing portions of an existing bridge, fabricating, erecting and painting steel girders, forming, casting and curing a reinforced concrete bridge deck with traffic barrier and bridge approach slabs, repairing bridge substructure, roadway excavation including haul, planing bituminous pavement, HMA, beam guardrail work, paint line, traffic control, detour route,