The IFB package is available for purchase for $35 (it cannot be downloaded from the website). This bridge replacement project on San Mateo Creek consists of, in part, replacement of a timber trestle bridge with new precast concret spans on CIDH piles and cast-in-place concrete bent caps. Engineer's Estimate is $9,595,000. The project is funded with FTA and ARRA funding; there is no DBE or UDBE goal on this project. The prebid will be on September 9 at 2:30 at SANDAG. A site visit will be September 10 at 1:00 at NCTD (see additional details). Bids are due by September 29 by 2:30 p.m. at SANDAG. Contact Steve Hoyle ([email protected]) and Louise Torio ([email protected]) with questions