Mandatory pre-bid meeting on June 4, 2010. Vendor will install, calabrate and certify the installation of an element application system to apply 3M's bonded elements, on a dual color pressure paint striper truck. The system shall be capable of applying the elements at speeds up to 10 mph at a rate of 2.0 - 2.5 lbs/gal.