Project involves remove existing boiler serving building HVAC system and replace with a new system consisting of two (2) high efficiency condensing boilers, pumps, piping, expansion tank, air separator and breaching. Project includes miscellaneous carpentry, mechanical, electrical, controls, insulation and balancing.