Non-mandatory pre-proposal conference 12/17/2009.
The work to be done consists of the furnishing of all materials, labor, and equipment for
the complete construction of:
Public Boat Landing Improvements. The general scope of the
improvements includes replacement of the existing concrete ramp with a new 28x 108
aluminum groundout floating dock and concrete abutment, riprap scour protection, and
replacement of one existing timber pile dolphins.