project will consist of adding structural timbers to approximately 50 feet of boardwalk in front of the the Post Office, replacing and repairing miscellaneous boardwalk decking and handrail, installing 21 poured in place concrete footings for existing boardwalk piles, placing select gravel fill in various portions of the boardwalk path, installing non-skid deck surfacing in various places along the existing boardwalk, and providing timber for future boardwalk repairs.