The work of this project will consist of civil work to bring the Lake flood levee up to standards for certification and other site work. The levee work includes repairing damage caused by overgrowth, scouring, and erosion to the inner levee sideslopes; waterproofing on the east concrete retaining wall and levee seeding repair of the road along the crest of the levee. Other site work in the project includes grading and concrete floor installation near the Clarifier Grit Building; asphalt paving on the levee, plant access road and parking area, and installation of bollards.