This document has expired, therefore the above link may no longer work.
FURNISH LABOR, EQUIPMENT, MORTAR, TRANSPORTATION AND INCIDENTALS TO REPLACE FACE BRICK (FURNISHED BY THE STATE) ON THE RAMP WALL AT THE WEST END OF THE TUNNEL. ALL WORK TO BE PERFORMED DURING THE DAY MONDAY - FRIDAY