Demolition of existing installations to facilitate the work of this contract.
• Removal of side wall mesh and replacement with SS wire woven mesh.
• Replacement of some overhead mesh as identified.
• Cutting of pole tops and capping with metal.
• Asphalt path modification.
• Hand rail replacement.
• Minor landscape.
• Installation of a new trench drain with tie into existing storm drainage systems.
• Modifications to the vestibule entrance into the exhibit. (see Alternate on Drawings).
• Visitor access to be maintained except as required to provide public safety on all weekends and minimal scheduled impacts to access during the week.
Attachment ‘B’ – Africa Lagoon Renovation
• Demolition of existing installations to facilitate the work of this contract.
• Construction of a new pool, infrastructures and renovations including preparations for an upgraded filtration system. (see Alternates on Drawings).
• Remodel of two (2) rooms in the existing structure for the purpose of flamingo holding.
• Construction of a second, new structure for bird holding.
• Construction and infrastructure of a pool house for future pool equipment. (see Alternates on Drawings).
• Construction of a new guardrail, along the visitor path.
• Partial demolition of existing shotcrete landscape walls to accommodate new access doors for flamingo holding and enhance visitor path.
• New landscaping.
• Upgrades to Mechanical, Plumbing, Electrical Systems, and site utilities.
• See Bid alternates (on Drawings) for #1- filtration equipment, #2-caging and associated hardware and #3-conduit for future video signal.
• Visitor access to be maintained except as required to provide public safety on all weekends and minimal scheduled impacts to access during the week.