Construction of an ADA accessible sidewalk approximately one mile in length. .
The proposed sidewalk will extend across two existing channel crossings and will require headwall reconstruction, installation of pedestrian railing and reconstruction of a rundown connection to the existing channel. No work will be required within the channels.