The work comprises, but is not limited to: Mobilizatione traffic controle 6-ft tapered cold-planinge crack sealinge construction of a 3/8-inch Asphalt Rubber and Aggregate Membrane (ARAM) interlayere construction of full width 0.12-ft AC Overlaye R&R of ADA rampse adjusting water/gas valves and manhole covers to gradee painting of traffic stripes including glass beadse and installation of raised pavement markers.