The Work includes, but is not limited to: Construct, maintain, and remove temporary work zone traffic control and erosion control measures; Removal of structures and obstruction, clearing and grubbing, and earthwork operations; Construct drainage system including water quality facilities, sewer pipes, manholes and inlets; Construct vaulted sidewalks and bench foundations; Construct roadway improvements including cold plane pavement removal, aggregate base, concrete wearing surfaces, concrete curb and sidewalks; Place pavement markings and striping; Install signing; Install illumination; Roadside development including seeding, tree planting, tree grates, and bike racks.