This project is intended to provide for the placement of asphalt material, edge milling and/or curb to curb milling of existing asphalt surfaces, physical adjustment of existing utilities, removal and installation of utility grade adjustment rings to new grade, removal and replacement of speed humps, grinding up existing stop bars and crosswalks (replacement by-others), placement of 2” full depth surface course asphalt and miscellaneous base repairs on a specified list of streets which must be completed within a specific time frame.