The Ashton Office HVAC project includes all requirements necessary for the retrofit and reconstruction of an efficiently operating Heating, Ventilating, and Air Conditions system for the existing Ashton District Office structure. This will include demolition of the existing furnaces, cooling coils, air cooled condensers, and associated LP gas and refrigeration piping. All incidental demolished material is to be disposed of as required by the local jurisdictions. All equipment, including furnaces, and connections to existing ductwork as indicated is to be provided and installed. All required LP gas piping and valving, furnace exhaust flues, and fresh and outside combustion air, coil and furnace condensate drain piping, and all controls is to be provided. Ductwork and refrigeration piping insulation, all wall penetrations, all ductwork, piping and supports, concrete pads for air cooled condensers is to be included. New installed thermostats are to be provided.
The project is located in the Ashton Ranger District of the Caribou-Targhee National Forest, located in Idaho. It is located at 46 S Hwy 20 in the City of Ashton, Idaho, 83420. The project may be accessed from State Highway 20.
This requirement is being solicited as a Firm-Fixed Price Request for Quote (RFQ). The performance period for the completion of the project is 75 calendar days.
Proposals are due at 3:00 p.m. MST, August 11, 2014. The estimated price range is $25,000 to $150,000. The solicitation will be available on approximately July 10, 2014, and may be downloaded from this site at that time. All responsible vendors shall be registered in the System for Award Management (SAM) database. All responsible sources may submit a proposal which will be considered by the agency.
Kellie J Shaw, Contract Specialist, Phone 208-557-5766, Fax 208-557-5829, Email [email protected]