The scope will be the asbestos abatement and removal of approximately 15190 GSF of existing space in the Building (J), levels 6 and 7. The space will require demolition and removal of all asbestos containing materials as shown on EcoSystems Environmental, Inc. reports for J6 and J7 dated February 27, 2012.