This document has expired, therefore the above link may no longer work.
The abbreviated Summary of Work is as follows: Asbestos Abatement Project Design-4 Houses (Houses A, B, E, & F) Abatement of TSI insulation in the attic and basement of Houses 'A', 'B', 'E', and 'F'.