The City program is requesting statements of qualifications for selection of a professional artist-led consultant team made up of a lead visual artist/designer, engineering professionals and other subconsultants as determined necessary by the City and/or lead artist to design a work of art that will serve as infrastructure in the form of a wall enclosing the Citys downtown electrical substation located in the District.