This document has expired, therefore the above link may no longer work.
Work includes: 1. Erosion control 2. Temporary traffic control 3. Pavement removals and grading work 4. Sheet piling 5. Structure removals. 6. Grading and placement of imported Granular Borrow and Aggregate Class 5 7. Bituminous paving