Mandatory pre-bid conference on June 8, 2010. College's purpose for this solicitation is to obtain the services of a qualified contractor to repair the construction of the Wellness Center for the sole purpose of alleviating water penetration. The Specifications and Drawings will be available only at the Mandatory Pre-Bid meeting.