This project consists of surfacing the runway, taxiway, apron, airport access road and segmented circle pad that was constructed during Airport Improvements, Stage I; installing 8 wind cone and segmented circle; installing runway and edge markers and airport traffic signs; improving drainage by filling depression adjacent to runway and constructing a drainage ditch; Additive Alternate 1 expands the apron 150 by 250; and Additive Alternate 2 extends the runway and safety area 120 by 300.