This project consists of regrading and resurfacing runway, safety areas, and apron; widening and resurfacing taxiway; replacing airport lighting system; realigning and reconstructing access road; replacing culverts; installing geotextile; constructing various gravel pads as shown on the plans; and constructing a new snow removal equipment building and pad.