Provide
engineering/design for relocation of wind cone and segmented circle; replace PLASIs
with PAPIs; reconstruct runway 17-35; extend runway 17-35; mark runway; replace
guidance signs; extend MIRL; rehabilitate hangar access and stub taxiways; construct
partial parallel taxiway to runway 17; rehabilitate hangar and tie-down apron; install
security fencing and replace beacon and tower.