The RFP Database
New business relationships start here

Air Conditioning


Pennsylvania, United States
Government : State
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Remove the 2 split systems serving the second floor. Provide an energy recovery system for dedicated outside air. Provide a Variable Refrigerant System to heat and cool zones throughout the building. Provide all required electrical upgrades and connections as required for the mechanical equipment.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP