The RFP Database
New business relationships start here

Addition/Remodel


Washington, United States
Government : Municipal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

TODD HALL ADDITIONREMODEL ROOMS 368, 370, 374, 389 & 391PULLMAN, WAMay 2009Sealed bids are being requested by the Associate Vice President of Facilities Operations, representing the Board of Regents of Washington State University, for the "TODD HALL ADDITION - REMODEL ROOMS 368, 370, 374, 389 & 391" constructed at Pullman, WA.Project Scope: This project is to remodel approximately 1,700 square feet of existing office spaces into a reception area, computer lab, conference room, observation and testing rooms, and a control room in Todd Hall Addition on the Pullman campus of Washington State University. Work includes construction of sound attenuating walls; low-profile access floor; reconfiguration of the HVAC system with new VAV boxes; electrical power; lighting and data systems reconfiguration and distribution; finishes including suspended acoustical ceilings; and carpet tile and painting throughout.Estimated Base Bid is approximately: $510,000.00-$570,000.00Alternate 1:-Provide casework in computer lab 368D.Alternate 2:-Provide casework, plumbing and under counter -refrigerator in conference room 368F.Bids will be received in Room 101, McCluskey Services Building, Washington State University, Pullman, Washington as follows: -The Form of Proposal and Responsibility Review Information (see Document 00100 - Instructions to Bidders; Para. K.2.b) shall be received prior to 2:00 p.m., June 9, 2009. -All bid submittals received will remain sealed until 2:15 p.m. June 9, 2009, when they will be opened and read aloud in Room 180E, McCluskey Services Building. Bid submittals received after the time set for receipt will not be considered.Contract documents may be examined at the following offices:McCluskey Svcs. Bldg. Rm. 101, Pullman, WALewiston/Clarkston Plan Center, Lewiston, IDAssoc. Builders & Contractors, Spokane, WASpokane Regional Plan Center, Spokane, WAAssoc. General Contractors, Spokane, WABuilder's Exchange of Washington, Everett, WAIdaho Assoc. General Contractors, Hayden, IDCopies of bid documents may be obtained through Facilities Operations, 509-335-9002, (no deposit required) and may be downloaded, viewed, or printed through the Builder's Exchange of Washington, www.bxwa.com, by and for bona fide bidders.Parking on campus is enforced 24 hours a day, every day. It is the bidder's responsibility to obtain parking permits to attend pre-bid meetings, site visits, and bid openings. Go to www.parking.wsu.edu for more information about visitor parking permits.A pre-bid meeting/site walk through will be held at 10:00 a.m. on June, 2, 2009 in McCluskey Services Building, Room 180E.Project completion is required 110 calendar days after issuance of the Notice to Proceed. The period of 110 calendar days includes 0 days of inclement weather/lost working days per month as defined in the "Modifications to the General Conditions". Liquidated damages are established at the rate of $1,500.00 per day.The Board of Regents of Washington State University reserves the right to reject any or all bids and to waive informalities advantageous to the University and/or the protection of the public interest.Greg RoyerVice President for Business and FinanceTreasurer, Board of RegentsWashington State University

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP