This document has expired, therefore the above link may no longer work.
Work consists of the removing the mechanical duckwork, ceilings, light fixtures, asbestos ceilings, and installing new HVAC system, sprinkler system and fire alarm system, new gypsum board ceilings and lay-in ceilings. at the State Hospital.