This document has expired, therefore the above link may no longer work.
Mobilization and Demobilization, Implementation of the Erosion and Sediment Control, Clearing and Grubbing, Grading 70,000 C.Y., Subsurface Drain Header 152 Ft., Subsurface Drain Laterals 300 Ft., and Seeding 10.5 Acres.