The work shall consist of but is not limited to the contractor supplying the labor, equipment, superintendence, material, etc., to accomplish concrete slab replacement, concrete patching, crack sealing, deep injection crack sealing and all other incidentals associated with this work at repair sites designated by the Lafayette Consolidated Government on Ambassador Caffery Parkway from W. Bonaire Drive to Dulles Drive. All work shall be completed within seventy-five (75) working days.