This document has expired, therefore the above link may no longer work.
The scope of work includes grind and overlay 0.2' of asphalt concrete, thermo plastic striping, replacing damaged traffic signal detector loops, replacing curb ramps to current ADA standard and adjust manholes to finish grade.