The RFP Database
New business relationships start here

ADD LANES & RECONSTRUCT


Florida, United States
RFP
Download the rfp file: FL_Lanes_020410.pdf.

Work consists of providing all labor, materials, equipment and incidentals necessary for the reconstruction of
approximately 6.5 miles of the existing northbound Turnpike three-lane section to six lanes from Sunrise Boulevard to
Atlantic Boulevard (County MP 12.484 to County MP 18.934). In addition, existing structures, interchange ramps, the
Mainline Toll Plaza and side roads will be modified to accomodate the proposed section. An additional through lane will be
constructed to the outside in the northbound direction. The existing three-lane roadway will be milled and resurfaced.
Sound Barrier walls and other improvements (drainage, signing, landscaping, retaining walls, bridge widening and lighting)
are included within these limits that support the widening of the Mainline.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP