Project involves the following at the Correctional Center: modification upgrades to two (2) existing shower and toilet rooms including, but not limited to, plumbing fixture and piping upgrades; selected wall and floor slab modifications; wall, floor and ceiling finish upgrades; ventilation upgrades.