The RFP Database
New business relationships start here

4 Post 6 ton Lift (Delivery and Installation required) and Wheel Aligner.


Armed Forces Pacific, United States
Government : Military
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Requirement is for 1 ea 4 Post 6 Ton Lift and 1 ea Wheel Aligner. The Lift requires contractor to deliver and install item. Installation will be conducted in South Korea.

MAJ MARLON ELBELAU, 011-82-2-7914-3

411th CSB (PARC Korea)

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP