This project includes the below stated service work:
The Contractor shall rip the existing road surface for road crushing by obtaining enough material to be uniformly processed, shaped and compacted at the optimum moisture content to provide proper inslope or outslope for road surface drainage described in Special Project Specifications Section C-6 (d). The Contractor shall furnish labor, equipment, supervision, transportation, supplies, and incidentals (except government supplied materials) to perform all work specified here within.
The Contractor shall remove and replace all existing Surface Water Deflectors (Belted Water Bar drainage structures)
Project is located:
The Beaver Creek Road No. 303 is located on the St Joe Ranger District of the Idaho Panhandle National Forests. The project starts at Mile Post 4.9 on Forest FR 303 in Township 43 N, Range 8 East, Section 22 and ends at Mile Post 7.9 in Township 43 N, Range 8 East, Section 20.
To Reach the project go East on State highway 50 from St Maries Idaho to Mile Post 78, then South on Forest Road (FR) 212 approximately 7 miles to the intersection of Beaver Creek Road FR 303. Take Beaver Creek Road 3.9 miles to the beginning of the project.
Michael J. Allred, Contracting Officer, Phone 4062837618, Email [email protected]