This requiremetn is for a 2 Ton Underhung Crane
Offeror must submit drawings with adeuate information and specifications with their proposal in order for the technical evaluator to determine the proposed equipment meets the specifications listed in the attached item description document.
LaTanya Harley, Contract Specialist, Email latanya.harley@us.af.mil