This project provides for grind, overlay, and replacement of the existing surface treatment and includes removal of existing asphalt concrete pavement, removing existing curb, gutter, sidewalk, removal of existing sidewalk ramps, removal of existing channelization, adjustments of existing catch basins, and manholes to finished grade, planing, overlay with HMA Class 1/2 Inch, installation of friction surface course treatment, installation of new channelization, miscellaneous electrical work, and other work.