The purpose of the project is to rehabilitate the existing bridge. The existing bridge is three simple spans having approximate lengths of 54', 68', and 54' concrete slab composite with steel beams superstructure. The substructure has concrete abutments on pile foundations and two solid shaft concrete piers on spread footings