The Work will consist of, but not be limited to, providing all labor, materials, and incidentals necessary, including mobilization, demobilization, bonding and insurance; providing water; dismantling and removing treatment buildings and contents; constructing a retaining wall; constructing a rock cap; installing a mesh-wire, wood-post fence; and constructing a run-on diversion ditch.