There are currently several humidity and temperature control issues to be addressed in the County Courthouse Building. It has been determined that the water chiller must be replaced. Further details of the required chiller replacement as well as humidity and temperature issues are generally covered in this Request for Proposals. More detailed information will be discussed at a mandatory pre-proposal meeting.